Newfax Corporation

You will find the Order Plans & Specs button once you've select the project listed below.

  1. City of Toledo Hillside Pump Station Improvements Cost of documents nonrefundable payable to Newfax Corp. in the amount of $ 40.00.
    Sealed bids will be received until 2:00 p.m. on Tuesday September 25, 2012. A pre-bid conference and Site visit held at Division of Water Reclamation, Bay View Wastewater Treatment Plant, on Friday September 14,2012 at 10:00 a.m. local time. ATTENDANCE is STRONGLY ENCOURAGED. Technical questions regarding this project should be directed to the Project Manager, Alex Gyurgyak, Dmytryka Jacobs Engineers, Inc. at 419-380-4900.

  2. Telemetry System Upgrade Improvement I-63 Cost of documents $75.00 payable to Newfax Corp. Shipping cost are the bidders responsibility.
    Sealed bids for the City of Toledo Telemetry System Upgrade Improvement I-63 project will be received until 2:00 p.m. local time on Tuesday, September 18th, 2012 at which time they will be publicly opened and read. Technical questions regarding the project should be directed to the Project Manager, Alex Gyurgyak, Dmytryka Jacobs Engineer, Inc. 419-380-4900. A pre-Bid conference and Site visit held at the Division of Water Reclamation, Bay View Wastewater Treatment Plant on Thursday September 6th at 1:00 p.m. local time. Attendance is STRONGLY ENCOURAGED.

  3. Village of Jackson Center, Ohio, New Well Nos. 5 & 6

    Cost of documents $41.09 payable to Newfax Corp.
    Sealed Bids for Village of Jackson Center, Ohio, New Well Nos. 5 & 6, will be received by the Village of Jackson Center, Ohio, at the Village Administrator’s Office, 122 East Pike Street, P.O. Box 819, Jackson Center, Ohio 45334-0819, until 12 p.m., local time, on September 6, 2012, at which time they will be publicly opened and read.

    In general, the work consists of a Base and Alternate Bid. The Base Bid includes drilling and installing two 12-inch diameter wells and constructing the associated Masonry & Wood Construction well houses, with concrete foundation. Installation of approximately 1,200 LF of 6 and 8 inch water line. As well as installation of approximately 1,200 feet of underground electrical and control for service to New Wells.
    The Alternate Bid includes abandonment of one existing well and demolition of piping and Masonry Construction Well House. Installation of approximately 1,700 LF of stone access road. Copies of the Bidding Documents may be examined at the above office, or at the office of Jones & Henry Engineers, Ltd., 3103 Executive Parkway, Suite 300, Toledo, Ohio 43606, without charge.

    Technical questions regarding the project should be faxed to the Project Manager, Clifford M. Gordon, P.E., CGWP, at Jones & Henry Engineers, Ltd., (419) 473-8924.